Blog

How long does it take to build a website? Timelines by type and phase, from published schedules

Published schedules put a professional marketing site at 10 to 16 weeks and larger builds at 4 to 6 months. Content and approvals, not code, set the date.

By Nicolás Cerón ·

The inside of a clock tower at night: a glowing clock face without numbers, brass gears and ladders, and a long pendulum with a red bob at the centre.
On this page

The short answer

A professionally built marketing website usually takes 10 to 16 weeks from kickoff to launch, and a larger or more custom one four to six months, judging by the schedules agencies and platforms publish. A landing page on a builder can go live in days; moving a simple online store to Shopify takes 6 to 8 weeks and an enterprise replatform 6 to 12 months; a web app's first version, 8 to 12 weeks with a small team.

The build itself is rarely what sets the date. The published schedules keep naming the same delays: content that arrives late and slow approvals, with unscoped integrations and legal review close behind. A project that starts with final copy and one decision-maker avoids most of them.

What the published timelines say

We read the timelines that platforms and agencies publish on their own sites, on 17 October 2026. They measure different things (some count hiring the developer, some start at kickoff), so the table notes what each includes.

SourceWhat it describesPublished timeline
HubSpotA professionally built site, from choosing a developer to launch5 to 6 months
Shopify (May 2025)Any website, simple to complexOne week to 5 months: a few simple pages on a pre-built theme in a week, a complex custom site 4 months or longer
Wix (updated September 2026)A site built with a professional2 to 5 months
iDesign, web design agency (May 2026)Small business site, 10 to 20 pages, no e-commerce10 to 16 weeks
iDesignE-commerce, custom features or significant integrations16 to 28 weeks
iDesignEnterprise or highly custom6 months to a year
Huemor, web design agency (updated June 2026)Its full design-and-build process, pre-kickoff to post-launchAbout 26 to 36 weeks, adding its phases
WebflowGrafit's rebuild of Callstack's site, a case Webflow published6 weeks

The spread is wide because the projects are. Two things narrow it: the type of site, and how much of the content and decision-making is ready before the build starts.

How long each type of site takes

Type of siteTypical published rangeSources
Landing page1 to 2 days on a builder; 5 business days to 3 weeks with a studioWix; Macgráficas, Newemage and Cangrejo Digital (below)
Small business site (5 to 10 pages)2 to 8 weeks with a studio, when content is readyCangrejo Digital, Newemage
Marketing site with a CMS (10 to 20 pages)10 to 16 weeksiDesign
Online store6 to 8 weeks for a simple Shopify migration; 12 to 16 weeks with complex integrations; 6 to 12 months for an enterprise replatformShopify
Web app MVP8 to 12 weeks for a first version with three peoplethoughtbot

Some notes on the rows:

  • Landing pages. Wix says landing pages and one-page sites "can sometimes take one to two days" on its builder. Studios that publish delivery times quote more: in Colombia, Macgráficas lists 5 to 8 business days and Cangrejo Digital 1 to 3 weeks; in Mexico, Newemage lists 1 to 2 weeks for its basic package. The difference is the copy, the design and the tracking, not the page count. Our guide to landing page cost covers what each level includes.
  • Small sites. Cangrejo Digital, updated 29 September 2026, gives 2 to 4 weeks for a 5 to 8 page site and 4 to 8 weeks for a corporate site, and adds one to three weeks if the copy and photography still have to be produced.
  • Stores. Shopify's guide to managed migrations, published 19 March 2026, says "simple stores might complete in 6–8 weeks" and "enterprise migrations with complex integrations typically run 12–16 weeks" (Shopify). Its enterprise guide puts a full enterprise replatform at 6 to 12 months and a custom rebuild at 18 to 36 months or more to an initial launch (Shopify).
  • Web apps. thoughtbot, a product design and development consultancy, lists "Idea to Version 1" with three people over 8 to 12 weeks as a typical project in its public playbook, and writes that an MVP used to take "three or four months" before AI tools compressed prototyping (thoughtbot). Our guide to web app development cost covers scope and budget.

How long each phase takes

Three published schedules break the work into phases. They overlap in practice: content usually runs alongside design, and launch preparation alongside the build.

PhaseiDesignShopifyHubSpot
Discovery and planning2 to 4 weeks1 to 3 weeks (goals and information architecture), after 1 to 2 weeks choosing the CMS and hosting1 to 3 weeks of goal setting, then 1 to 2 weeks for an action plan
Content4 to 8 weeks for a 15-page site, alongside other stagesNot listed separatelyNot listed separately
Wireframes and design1 to 3 weeks of wireframes, then 3 to 6 weeks of visual design1 to 2 weeks of low-fidelity and 2 to 3 weeks of high-fidelity wireframes2 to 3 weeks of mockups and feedback
Build3 to 8 weeks4 to 10 weeks1 to 2 months
Testing and launch1 to 2 weeks of QA, then 1 to 2 weeks of launch and stabilization3 to 5 days1 to 2 weeks of review and revision

Huemor's process is longer at most steps: 4 weeks of discovery, 8 to 12 weeks of creative work, 8 to 12 weeks of development and 2 to 4 weeks of pre-launch checks. The difference is scope: research, prototypes and content strategy are part of its process. When you compare quotes, compare the phases, not the end date.

What delays website projects most

The published schedules agree on the causes, and none of them is code.

  1. Content. iDesign calls content that doesn't arrive on time "the single most common cause of timeline slippage." Wix: "Most website projects run long for reasons that have nothing to do with the tools. The biggest one is content." Copy, photography, product data, case studies and translations each need an owner and a date.
  2. Approvals. Each review that takes a week to come back adds a week. Extra reviewers add rounds: Wix notes that one reviewer moves faster than three people commenting in separate rounds. HubSpot warns that development "could stretch to three or even four" months if you keep adding changes.
  3. Integrations. CRM, booking, payments, inventory and single sign-on are engineering work, and their access, documentation and test accounts come from third parties. Shopify's managed-migration guide budgets one to two weeks of discovery just to map a store's data, integrations and technology stack.
  4. Legal and compliance. Privacy policy, terms, cookie consent and accessibility statements need someone with authority to sign them off. Book that review in the first weeks, not the last.
  5. Fixed calendar waits. Some steps can't be rushed, so start them early:
StepHow long it can takeSource
Moving a domain to another registrarNot possible within 60 days of registration or of a previous transfer, if the registrar refuses; the transfer code must come within 5 calendar days of the requestICANN
Pointing a domain at new nameserversUp to 24 hours for the registrar to update themCloudflare
Google crawling new or changed pages"A few days to a few weeks"Google Search Central

How to speed it up without cutting corners

  • Have the content before design starts. Final copy for the main pages, real photos, the product or service list. Design approved against placeholder text gets redesigned.
  • Name one decision-maker, and agree turnaround times. Two business days per review keeps a 12-week plan at 12 weeks. Webflow's six-week example credits "decisive ownership" with removing "the usual delays."
  • Use fewer unique layouts. Thirty pages built from four templates ship faster than ten pages that each need their own design.
  • Launch in phases. Put the pages that sell on the first release; the blog archive, the resource center and the second language can follow.
  • Choose standard integrations first. A form that emails your team and writes to your CRM through a native connector ships in days; a custom sync with an internal system takes weeks.
  • Start the fixed waits on day one. Registrar access, DNS, payment-provider accounts, legal review.

Speed has limits worth respecting. If a fast schedule means skipping the analytics baseline, redirects from the old site or testing on phones, it costs more later. If you're replacing a site that has search traffic, our website redesign checklist lists what has to happen before launch.

A sample schedule: one marketing site in 12 weeks

This is an example, not a quote: a 15-page marketing site with a CMS, a blog, a contact form connected to a CRM, and an existing site to replace. It assumes the content owners deliver on the dates below and each review comes back within two business days. It sits at the shorter end of iDesign's 10 to 16 weeks.

WeekWorkWhat the client provides
Before kickoffBrief, budget range, decision-maker namedAccess to analytics, Search Console, domain registrar
1Discovery: goals, audiences, analytics baseline, content inventoryInterviews with sales and support
2Sitemap, URL plan, content plan with ownersApproval of the sitemap
3Wireframes for the main templatesFeedback within two days; copy drafting starts
4Visual direction on the home pageOne consolidated round of feedback
5Design of the remaining templates and the component libraryDrafts of home and service page copy
6Design approval; CMS content model set upFinal approval of the designs
7Build: components and templatesRemaining copy and images
8Build: CMS, forms, CRM connection, analyticsTest CRM account
9Build complete; content entry beginsFinal copy for all pages
10Content complete; redirect map, metadata, accessibility passReview of the staging site
11QA on phones and browsers; speed and accessibility checks; fixesSign-off on legal pages
12Launch: DNS, redirects, Search Console, form testsSomeone with registrar access available
13–14Stabilization: fixes from real traffic, analytics checksReports of anything odd

Weeks 3 to 6 are where schedules slip. If week 5's copy arrives in week 8, launch moves by three weeks too.

Before you ask for a schedule

Write down the page list, who writes the content, the integrations and the date you need, and send the same brief to each studio so their timelines are comparable. Our website brief and RFP builder does that in a few minutes, and the website cost estimator gives a published-price range for the same scope. When the proposals come back, our guide to comparing design studios covers what to check beyond the date, and how much a website costs in the US puts the quotes in context. If you'd like Dardo to plan and build it, see web design, web development or, for an existing site, website redesign.

Common questions

How long does it take to build a website from scratch?

With a studio, a custom-designed marketing site of 10 to 20 pages usually takes 10 to 16 weeks from kickoff, judging by the schedules agencies publish, and larger or more integrated sites four to six months or more. On a website builder with a template, a simple site can go live in days. Most of the difference comes from content and approvals, not from coding.

Can a website be built in a week?

A landing page or a small site on a builder can, if the copy, images and decisions are ready. Shopify's own guide says a simple site with a few pages can be built in a week using a pre-built theme. A custom-designed site with several templates, a CMS and integrations takes longer, because design, content and review rounds each need time.

How long does a website redesign take?

About as long as a new build of the same size, and sometimes longer, because the old site adds work: an analytics baseline, a content inventory, redirects for changed URLs and checks after launch. Plan the same 10 to 16 weeks for a mid-size marketing site, and more if the platform changes too.

What slows down a website project the most?

Content that arrives late is the cause published agency schedules name most often, followed by slow or multi-round approvals. Integrations with CRMs, payments or internal systems, legal review of privacy and terms pages, and access to the domain registrar are the next most common delays.

How long after launch does a website appear on Google?

Google says crawling can take from a few days to a few weeks. Submitting a sitemap in Search Console and linking to the new pages from pages Google already knows helps it find them. Appearing for competitive searches takes longer and depends on the content and links, not only on indexing.

How long does it take to build an online store?

Shopify says simple store migrations to its platform might take 6 to 8 weeks and enterprise migrations with complex integrations 12 to 16 weeks, while a full enterprise replatform typically takes 6 to 12 months. Catalog size, payment and shipping setup, and integrations with inventory or ERP systems drive the difference.

Sources & further reading

Sources behind this page, with further detail from the original publishers.